Bilfinger BergerInnovations and Patents

Every civil engineering project is a new challenge. Even though we can draw on several decades of experience in the planning and execution of large projects, we are always ready to use new and innovative solutions – with highly impressive results.

Innovations and Patents:
  • Driving sheet piles by DGPS (Protective piling in the Elbe Tunnel)
  • Spherical grab with multiple shears (Puente Centenario)
  • Heavy load carrier (Taiwan High Speed Rail Line)
  • Back-up system for tunnel boring machines (Herren Tunnel, Luebeck)
  • Automatic vertical transport of excavated material (Hofolding Gallery)
  • SPACE: Earthquake monitoring system with vibration dampers (Taiwan High Speed Rail Line)
  • Offshore installation and foundations in deep water (Fino research platform)
  • Tower-mounted cable crane (Svinesund Bridge)
  • BRIMOS: Bridge Monitoring System (Svinesund Bridge)
  • TEMP!Riss: Simulation software for temperature and tension fields in concrete (Leibis-Lichte Dam)
  • Non-destructive test methods (Goeggelsbuch ICE High Speed Railway Tunnel)
  • Gallery lining machine (Gotthard Base Tunnel)
  • Thrust boring and bridge insertion (Forchheim Road Tunnel)
  • Grouting and laying method for slab tracks (Nuremberg–Ingolstadt ICE High Speed Railway Line)
  • Self-compacting concrete (Schirnding Bridge)
  • Segmental bridges with a reduced need for prestressing steel (Four Bears Bridge)
  • Concrete components in contact with the ground containing special concrete (Mannheim Large Power Station)
© Bilfinger Berger Ingenieurbau GmbH | Imprint | Data protection information | Last update 15.05.2012